New York City · Residential & commercialinfo@hvac.repair
Call Now

Which equipment is actually covered by your HVAC maintenance agreement?

A contract can say “quarterly HVAC maintenance” and still leave two people picturing different equipment. A Manhattan retail tenant may own the split system behind the counter while the landlord controls the air handler above the sales floor. Before the first visit, reconcile the contract’s equipment schedule with the building’s list.

Make each row identifiable

Give each unit a stable label, physical location and area served. Add the manufacturer and model from existing records or an accessible label. Preserve old tags when a renovation changes room names. Record indoor and outdoor sections as a linked pair when appropriate. A count of six units means little if two rows describe opposite ends of the same system.

Read across the row to the scope

Next to each unit, enter the party responsible for access, the tasks included, when they occur and the work that needs separate authorization. “Filters included” may refer to labor, materials or both. A drive serving an exhaust fan does not automatically fall within a rooftop unit’s scope. Mark unresolved items as open and send them to the person who can confirm coverage.

Use the list at the visit

Ask the service report to reference the same labels. A missed unit then shows up as a missing row instead of disappearing inside “maintenance completed.” The federal operations and maintenance guide provides background on maintenance records. When arranging HVAC support for property management, share the disputed rows and access contacts first.

Room equipment below a window with space needed for service access